Piling Works for Highways & Bridges

Cable Stay Bridge along Lebuh Raya Damansara-Puchong at Federal Highway Route 2

Motorola Interchange Bridge, LDP at Petaling Jaya

Scope of Works: Bored Pile

We were involved in one of the earliest multilevel highway interchanges in Malaysia in 1997. Using a casing rotator bored pile machine for limestone rock conditions

Kerinchi Interchange - IC 13 Sprint Expressways - Package A2

Scope of Works: Pre-boring, Micropile, Bored Pile, Contiguous Bored Pile

Shinei Geotechnique Sdn Bhd is your trusted partner for complex highway construction piling works. With extensive experience and a wide range of techniques like micropiles, caisson piles, bored piles, driven piles and retaining wall construction, we are well-equipped to tackle challenging highway projects. Our advanced equipment and skilled team ensure safety, efficiency, and precision in every task. Choose Shinei Geotechnique for reliable and expert handling of your highway construction needs.

Jalan Tun Razak / Jalan Bukit Bintang Underpass

SUKE Highway

Lateral Load Test on slope

Raked Micropile

Project Owners and Developers

  • ARE YOU CALLING FOR A TENDER ?
  • ARE YOU LOOKING FOR A SPECIALIST PILING CONTRACTOR ?
  • DO YOU NEED AN ALTERNATIVE DESIGN ?

Reduce your cost and construction period

INVITE TO TENDER

About the Author

Ir Tan Chin Shu is a Geotechnical Engineer with over 40 years’ experience in the foundation and geotechnical engineering industry. He is the founding Director of Shinei Geotechnique, a specialist contractor in Malaysia.