Piling Works for Highways & Bridges

Cable Stay Bridge along Lebuh Raya Damansara-Puchong at Federal Highway Route 2

Motorola Interchange Bridge, LDP at Petaling Jaya

Scope of Works: Bored Pile

We were involved in one of the earliest multilevel highway interchanges in Malaysia in 1997. Using a casing rotator bored pile machine for limestone rock conditions

Kerinchi Interchange - IC 13 Sprint Expressways - Package A2

Scope of Works: Pre-boring, Micropile, Bored Pile, Contiguous Bored Pile

Project Owners and Developers

  • ARE YOU CALLING FOR A TENDER ?
  • ARE YOU LOOKING FOR A SPECIALIST PILING CONTRACTOR ?
  • DO YOU NEED AN ALTERNATIVE DESIGN ?

Reduce your cost and construction period

INVITE TO TENDER

About the Author

Ir Tan Chin Shu is a Geotechnical Engineer with over 40 years’ experience in the foundation and geotechnical engineering industry. He is the founding Director of Shinei Geotechnique, a specialist contractor in Malaysia.