Scope of Works: Bored Pile
We were involved in one of the earliest multilevel highway interchanges in Malaysia in 1997. Using a casing rotator bored pile machine for limestone rock conditions
Scope of Works: Pre-boring, Micropile, Bored Pile, Contiguous Bored Pile
Reduce your cost and construction period
Ir Tan Chin Shu is a Geotechnical Engineer with over 40 years’ experience in the foundation and geotechnical engineering industry. He is the founding Director of Shinei Geotechnique, a specialist contractor in Malaysia.
Call: +603 5633 4159
Whatsapp: +60 12-399 1520
Email: shineicstan@gmail.com
Address: No 15A, Jalan USJ 1/20, 47600, Subang Jaya, Selangor Darul Ehsan, Malaysia
BRN: 183719-A