PJ Sentral
Client: MRCB
Water Leakage from damaged Contiguous Bored Pile Retaining Wall - Before Repair Works
Repair Work on skin wall of Bored Piles and Water Proofing using Pressure Grouting
Reduce your cost and construction period
Ir Tan Chin Shu is a Geotechnical Engineer with over 40 years’ experience in the foundation and geotechnical engineering industry. He is the founding Director of Shinei Geotechnique, a specialist contractor in Malaysia.