Micropile Underpinning of Office Tower
Lorong P Ramlee
24 floors office tower to 34 floors mix used tower block with serviced apartment and extension of old building in annexed wing
Scope of Works: Micropile Underpinning
Redevelopment of Plaza Atrium from a corporate office tower to a mix use building commenced in 2005.
This building is located in the centre of KL on a slope, with the back side of the building on a higher elevation.
Access to the basement with micropile rig had to be carefully planned out.
Construction work commenced while other parts of the building was still in construction.
The low headroom of only one floor meant that extra space was needed for the micropile rig to access certain pile points, this required careful demolition of a number of walls.
Underpinning was successfully completed.
Reduce your cost and construction period
Ir Tan Chin Shu is a Geotechnical Engineer with over 40 years’ experience in the foundation and geotechnical engineering industry. He is the founding Director of Shinei Geotechnique, a specialist contractor in Malaysia.
Address: No 15A, Jalan USJ 1/20, 47600, Subang Jaya, Selangor Darul Ehsan, Malaysia
BRN: 198901006414 (183719-A)