Pile Load Testing

Jalan Kemajuan, Petaling Jaya Midtown

Scope of Works: Load Test to 3080 Tonne

MHY, Menara Icon Tower, Jalan Tun Razak, KL

Scope of Works: Load Test to 1500 Tonne

MRT (Mass Rapid Transport) Transit Lane 2: Sungai Buluh – Serdang - Putrajaya (SSP) Package V206: Viaduct Guideway and other associated works

Scope of Work: Preliminary Load Test - Reaction Test Pile

Lateral Load Test on Micropile at Lot PT 9760, Mukim Setapak, Kuala Lumpur (KYS KL East International)

2500 tonne Load Test at LRT Petaling Jaya

Load Test under low headroom

Dayabumi Complex Underpinning Works Load Test

600 ton Load Test at Basement 2

Dayabumi Complex

Jalan Maarof / Damansara

Reaction Load Test under low headroom in highly congested location

Load Test under low headroom in highly congested location

Project Owners and Developers

  • ARE YOU CALLING FOR A TENDER ?
  • ARE YOU LOOKING FOR A SPECIALIST PILING CONTRACTOR ?
  • DO YOU NEED AN ALTERNATIVE DESIGN ?

Reduce your cost and construction period

INVITE TO TENDER

About the Author

Ir Tan Chin Shu is a Geotechnical Engineer with over 40 years’ experience in the foundation and geotechnical engineering industry. He is the founding Director of Shinei Geotechnique, a specialist contractor in Malaysia.