Scope of Works: Load Test to 3080 Tonne
Scope of Works: Load Test to 1500 Tonne
Scope of Work: Preliminary Load Test - Reaction Test Pile
600 ton Load Test at Basement 2
Dayabumi Complex
Jalan Maarof / Damansara
Reaction Load Test under low headroom in highly congested location
Reduce your cost and construction period
Ir Tan Chin Shu is a Geotechnical Engineer with over 40 years’ experience in the foundation and geotechnical engineering industry. He is the founding Director of Shinei Geotechnique, a specialist contractor in Malaysia.